Saturday, August 29, 2015

Release the River: Qwuloolt Project on the Snohomish

A big day for those that worked on the Qwuloolt project (/timelapse/tulalip/slideshow.htm). Steve alerted me to this time lapse of the opening of part of the Snohomish River estuary northeast of Everett and south of Marysville. The Snohomish estuary has been going through a transformation as poorly drained farm land that was protected by tidal flooding with levees has been opened up to the influence of tides. The changes have been fun to watch as Interstate-5 is a causeway over this periodically flooded estuary.

1 comment:

Anonymous said...

That was neat! Thanks for showing us.